JMac_Townsville Central Park Boardwalk_Queensland
Public Infrastructure

Townsville Central Park Boardwalk

Location
Townsville, Queensland
Value
$5.1 million
Client
Townsville City Council
Status
Complete

About the project

JMac was engaged to design and construct a boardwalk along Ross Creek, Townsville. Delivered as part of the Townsville Stadium Precinct upgrade, the boardwalk provides a key pedestrian connection between the stadium, Victoria Bridge and the Townsville CBD.

Scope

750 m³ of bulk earthworks

Construction of bearers and joists, including stainless steel bolts

Installation of 2,250 decking boards with decking screws

Construction of 500m² concrete footpath

Installation of 350 bollards and 6,50 m² of turf

Application of 15,000m² of hydromulch

Installation of 400 metres of stainless steel handrails with LED pilot lights and balustrade panels

Upgrade to stormwater infrastructure, including removal and replacement of ageing assets beneath the boardwalk

Upgrade to street lighting and installation of CCTV infrastructure

Outcomes

The project was delivered within an environmentally sensitive area adjacent to Ross Creek, on land previously used as a local landfill. All unsuitable materials were removed from site, with aquatic silt curtains and cofferdams installed to protect the creek and manage tidal variations of up to 3.5 metres.

JMac proposed an alternative construction methodology that achieved substantial program efficiencies and delivered a cost saving of $100,000 for the client.

townsville-central-park-boardwalk-(2)
townsville-central-park-boardwalk-(1)
townsville-central-park-boardwalk-(3)